Labels
Prioritized labels 0
Drag to reorder prioritized labels and change their relative priority.
Other labels 42
-
Upcoming/HoldingOak-Tree / Medical ImagingStuff that we know we need to work on, but haven't prioritized yet.
-
TestingOak-TreeThe issue has been implemented, prepared, and packaged. It is currently waiting on the results of testing (unit, integration, functional, or production) before being closed. Basically, really almost done (for real).
-
Test CaseOak-TreeA specific use-case or set of criteria that needs to be captured in a test (which is preferably automated).
-
StrategyOak-TreeBig picture discussions, clarificiations, and direction. “Where do we want to go?” rather than, “How do we get there?”
-
Sprint: CurrentOak-TreeIssues that are queued to be worked on now (but are not currently in development)
-
SpecificationOak-TreeDescribe how something should be done so that when you start, you don't make a mess
-
Review / StagingOak-TreeThe issue is currently in staging and requires review, or has appeared as part of quality assurance and needs to be addressed.
-
PrototypeOak-TreeThe first time you attempt to do something, you'll get it wrong, so build a prototype first. (Another way of saying we might not know how to do this.)
-
Product: Work and Dataflows NeededOak-TreeHow does a feature fit into the broader software? How do users enter and leave? How do we onboard and offboard?
-
Product: Review CompleteOak-TreeProduct team has finished the commercial assessment, ready to handoff.
-
Product: Mockups and Designs NeededOak-TreeWe understand how something is going to work, but how is going to function, look, and feel?
-
Product: Design StudyOak-TreeWhat are the real-world needs? What sorts of considerations do we need to look at?
-
Product: Commercial Analysis NeededOak-TreeIt's not clear where a particular feature or piece of functionality fits into the broader market/picture. Could someone please look at that?
-
Planning: TrackingOak-TreeA planning item that tracks multiple issues or merge requests. (A really big piece of scope.)
-
Pending Merge / In-ReviewOak-TreeThe feature has been implemented and is waiting to be reviewed or otherwise just hanging out. (Another way of saying, almost done.)
-
OperationsOak-TreeInvolves the operations of the technology. Might be related to platform, configuration, or runtime environment.